The Orwell Bridge emerging through cinematic light

Macc Flynn / Selected project record

Complexity,
directed.

Twelve major programmes across the environments where certainty matters most.

UK + Europe
Critical infrastructure

Built experience

Real programmes.
Real consequence.

From live aviation and underground rail to mission-critical data, regulated estates and national infrastructure.

The Palace of Westminster beside the River Thames
UK Parliament logo
Civic estate / Heritage infrastructureProgramme Multi-decade

UK Parliament

Restoration and Renewal (R&R) Programme

The Restoration and Renewal Programme is the long-term undertaking to protect the Grade I listed Palace of Westminster from managed decline and catastrophic failure. The nineteenth-century building's ageing infrastructure requires an exceptional level of care, coordination and technical governance.

Photo: David M Clark / Geograph, CC BY-SA 2.0
Heathrow Airport terminal construction programme
Balfour Beatty logo
Aviation / Major infrastructureContract value £592m

Balfour Beatty

Heathrow Airport Terminal 2B

Heathrow's largest airside development at the time was designed to serve up to 20 million passengers each year, delivered within a live airport environment over critical buried services and complex ground conditions.

Explore project detail

A combined top-down and bottom-up construction strategy saved six months on the programme. Delivery included what was then Europe's largest diaphragm wall, approximately 165,000 cubic metres of reinforced concrete, ground anchors, 16 aircraft stands, passenger facilities, retail areas and a basement for baggage and transit systems.

Tunnel boring works on the Crossrail programme
BFK joint venture and Elizabeth line logo
Rail / Tunnelling / Underground infrastructureContract value £100m

BFK joint venture

Crossrail C300 / C410

Delivery of the Crossrail Western Tunnels included two 6.2 metre internal-diameter bored tunnels running 6.5 kilometres from Royal Oak to Farringdon, with sprayed concrete lining works at key stations and the Fisher Street crossover.

Explore project detail

At peak production, tunnel boring machines advanced by up to 40 metres per day. The operation excavated approximately 3,000 tonnes of material and installed around 575 tonnes of precast lining rings each day.

Farringdon station construction within the Crossrail programme
Ferrovial logo
Rail / Underground infrastructureContract value £200m

Ferrovial

Farringdon Station

Major excavation, tunnelling, structural and mechanical and electrical works for the Elizabeth line station at Farringdon, delivered within a dense historic urban setting at depths of approximately 40 metres.

Explore project detail

The programme demanded close control of underground interfaces, logistics, temporary works and stakeholder constraints while maintaining progress in one of London's most complex construction environments.

Mission-critical data centre project in North Holland
Blue-chip technology client project mark
Data centres / Mission criticalContract value €22m

Blue-chip technology client

North Holland data centre

A large-scale data-centre project for a global software organisation in North Holland. Delivery planning and site operations were managed through significant and unpredictable weather challenges while protecting programme certainty and quality.

GlaxoSmithKline research and development estate project
GSK logo
Life sciences / Data centres / PowerProgramme value £120m

GlaxoSmithKline

WREF Global EMEA programme

A complex research and development estate portfolio covering two data centres, electrical infrastructure upgrades, transformers, a 132kV substation, low-voltage control rooms and resilience improvements.

Explore project detail

The programme also included civil works, utility and service diversions, decommissioning of laboratories, offices and plant rooms, relocation activity and preparation for land and building sales. Projects were managed across FIDIC and NEC4 contractual environments.

The through-line

Leadership that moves
at the speed of risk.
GovernanceCommercial controlDelivery certainty
Vauxhall Bridge refurbishment works in London
Vauxhall Bridge project logo
Highways / Bridges / StructuresContract value £10m

Transport for London delivery

Vauxhall Bridge refurbishment

Design and construction of the top-side refurbishment of the Grade II listed Vauxhall Bridge for Transport for London. The programme was completed ahead of schedule, with deck waterproofing and concrete repairs resolving persistent water-ingress issues.

Water utility pipework delivered through the Affinity Water framework
Kier Group logo
Water / UtilitiesAnnual value £25m

Kier Group

Affinity Water framework

Framework delivery in Hertfordshire covering trunk-main renewal and essential water infrastructure, supporting Affinity Water's wider capital investment programme.

Explore project detail

The portfolio included distribution mains, developer-led new mains and services, and the design and installation of trunk mains, coordinated as part of a major programme of asset improvement.

Large reservoir and heavy civil construction works
South West Water logo
Water / Heavy civil infrastructureProgramme value £150m+

South West Water

Reservoir and heavy civil programme

A portfolio of reservoir and heavy civil projects, including the design and construction of a new reservoir with storage capacity exceeding 5,000 million litres. The investment supports long-term water-resource planning and resilience in water-stressed regions.

The Orwell Bridge carrying the A14 across the River Orwell
National Highways logo
Highways / Bridges / StructuresNetwork A14

National Highways

The Orwell Bridge

A critical bridge project on the A14 south of Ipswich. Replacement of two westbound expansion joints was accelerated by two years after one joint was identified as potentially unsafe, with works completed in August 2025.

Reinforced concrete construction within a utility capital works programme
Thames Water logo
Water / Programme managementProgramme value £100m

Thames Water

Capital Works Programme management

Management of a complex series of related capital projects, aligning interdependencies, resources, governance and investment priorities. The programme approach created consistent portfolio control and a clear route from opportunity to delivery.

Major structural infrastructure viewed beneath a bridge deck
BTU
Joint Venture
Commercial / Framework governanceContract model NEC3

BTU joint venture

Framework management

Framework management for the BTU joint venture, with financial monitoring and control, health, safety, environmental and quality compliance, and collaborative working under an Alliance agreement.

Explore project detail

The framework applied Project Lifecycle Management and an NEC3 target-cost contract, supported by business cases prepared to House governance standards to secure project funding.